Proposed work includes making concrete repairs on I-94 and completing work on two bridges and at Menomonie rest areas

The Wisconsin Department of Transportation (WisDOT) is seeking public comment on a proposed rehabilitation project on I-94 from 550 feet west of the culvert carrying the interstate over the east branch of Wilson Creek to 2,000 feet east of the Red Cedar River bridges in the Dunn County city of Menomonie and towns of Menomonie and Red Cedar.
The public is encouraged to visit the project website, review materials, and submit comments by March 31 by:
Email: adam.hetrick@dot.wi.gov
Mail: Wisconsin Department of Transportation
718 W. Clairemont Ave..
Eau Claire, WI 54701
Attn.: Adam Hetrick
Three structures along I-94 and interstate pavement need rehabilitation. WisDOT is proposing the following on or at:
I-94:
Making concrete repairs on east- and westbound lanes on I-94
Milling and repaving asphalt shoulders
Cleaning culverts and retying culvert joints
Cleaned ditches and making embankment repairs
Replacing substandard guardrail and pavement markings
I-94/WIS 25 interchange:
Making concrete repairs on the interchange ramps
Replacing curb ramps on the south interchange ramps
Culvert carrying I-94 over the east branch of Wilson Creek
Replacing 50 feet of the north end of the culvert and its end wall
Bridge carrying WIS 25 (Broadway Street) over I-94
Replacing the bridge joints and the approach slabs
Repairing the back wall
Patching and fiber wrapping girder ends and pier caps
Bridge carrying Wilson Street over I-94
Overlaying the bridge deck with concrete
Rest areas 61 and 62
Repairing pavement and asphalt shoulders
Realigning car ramp entrances
Reconstructing inlets
Making spot repairs to curb, gutter and sidewalk
Replacing sidewalk curb ramps, signs and pavement markings
Installing new lighting and a truck informational system
Making improvements to historical markers and landscaping
Construction is currently scheduled for 2027.
During construction, I-94 will remain open, but motorists will encounter single-lane closures during off-peak travel times.
In addition:
A short-term single-lane closure on westbound on I-94 will be needed to complete the structure work at the east branch of Wilson Creek.
The remaining structure repairs will be completed using staged construction with single-lane closures.
WIS 25 interchange ramp repairs will be completed with overnight ramp closures.
Rest areas will remain open to traffic except during critical work operations.
For more information regarding traffic impacts, transportation news and improvement project updates in Wisconsin’s Northwest Region:
Follow us on Twitter: @WisDOTnorthwest
Visit the region’s 511 website: projects.511wi.gov/region/northwest/
Motorists are reminded that using handheld cell phones in Wisconsin work zones is illegal. Alerts and updates provided via these sites are not intended for use while driving. When driving, your focus should always be on driving.
WI DOT media release.