St. Croix County
Closures related to the replacement of the safety and weight enforcement facility (SWEF) near Hudson:
Description: Replacing the existing SWEF building with a modern one, reconstructing the parking lots and ramp/loop roadways and constructing an automated truck traffic monitoring system along eastbound I-94, a virtual weigh station along US 12 and an approximate 300-foot communications tower near the new building.
Traffic impacts: Motorists will encounter the following off-site impacts:
Westbound I-94:
There will be a continuous median shoulder closure with barrier wall until temporary widening of the eastbound median is removed later this summer.
Eastbound I-94:
There will be a continuous left-lane closure in the three-lane portion of I-94 near the US 12 interchange and lane shift until temporary widening of the eastbound median is removed later this summer. Two lanes of traffic will be maintained.
There will be a continuous outside shoulder closure with barrier wall at the SWEF ramp locations until tie-in work is completed this summer.
Closures related to the replacement of I-94 bridges over Carr Creek and County NN in St. Croix County and ramp construction:
Description: Building temporary roadway and bridges to maintain four lanes of traffic on I-94; removing and replacing the existing east- and westbound I-94 bridges over Carr Creek and County NN with structures wide enough to allow for an additional lane of traffic on I-94 when warranted; constructing eastbound exit ramp and westbound entrance ramp bridges and realigning the ramps at the I-94-County B interchange; extending the north end of the existing box culvert at County NN; and completing grading operations, approach work, sign installation and pavement marking.
Traffic impacts: Motorists can expect to encounter the following lane closures on I-94 for the coming week on:
Westbound I-94:
8 p.m. Sunday to 2 p.m. Monday
5 p.m. Monday to 2 p.m. Tuesday
5 p.m. Tuesday to 2 p.m. Wednesday
5 p.m. Wednesday to 2 p.m. Thursday
6 p.m. Thursday to 11 a.m. Friday
Eastbound I-94
6 p.m. Sunday to 10 a.m. Monday
5 p.m. Monday to 2 p.m. Tuesday
5 p.m. Tuesday to 2 p.m. Wednesday
5 p.m. Wednesday to 10 a.m. Thursday
6 p.m. Thursday to 9 a.m. Friday
Closures regarding Rush River bridges west of Baldwin
Description: Building temporary roadway and bridges to maintain four lanes of traffic on I-94; removing and replacing the existing east- and westbound I-94 bridges over the Rush River with structures wide enough to allow for an additional lane of traffic on I-94 when warranted, along with approach pavement; clearing and grubbing ditches; and installing storm sewer, signage, pavement marking, guardrail and fence.
Traffic impacts: Motorists will encounter the following closures for the coming week:
Eastbound I-94 lane closures:
7 p.m. Sunday to 10 a.m. Monday.
5 p.m. Monday to 2 p.m. Tuesday.
5 p.m. Tuesday to 2 p.m. Wednesday.
5 p.m. Wednesday to 11 a.m. Thursday.
6 p.m. Thursday to 9 a.m. Friday.
Eau Claire County
Closures on South Hastings Way from Pine Lodge Road to Gateway Drive
Description: Reconstructing the South Hastings Way frontage road, installing curb and gutter and building a multiuse path adjacent to the north side of the road.
Traffic impacts: South Hastings Way is closed to through traffic, and access is being maintained to driveways in the construction limits. Work is scheduled for May 8th through July.
I-94 just west of the WIS 312/County EE interchange to the Chippewa River Bridge northwest of WIS 37
Description: Reconstructing east- and westbound I-94 by removing and replacing the existing pavement from WIS 312/County EE to County E, replacing culverts and guardrail, installing median cable barrier, restoring the ditches and slopes and placing new pavement markings. Making improvements at the I-94/WIS 312/County EE interchange, including replacing the joints on the bridge, overlaying the deck with concrete and replacing the pavement on either side of the bridge and the ramps. Resurfacing east- and westbound I-94 by milling and overlaying the existing asphalt pavement from County C to the Chippewa River Bridge.
Traffic impacts: Motorists will encounter bidirectional traffic on I-94 and WIS 312.
I-94 traffic is operating on the westbound lanes from County E to just west of the WIS 312/County EE interchange.
Next week, eastbound traffic is expected to be switched back to the eastbound lanes, and there will be one lane of traffic in each direction, with I-94 being fully reopened to traffic by noon Friday, May 26.
WIS 312 traffic is operating on the eastbound lanes in the interchange area.
For more information regarding traffic impacts and transportation news in Wisconsin’s Northwest Region:
Follow us on Twitter: @WisDOTnorthwest
Visit the NW region's 511 website: projects.511wi.gov/region/northwest/